ROOF SUPPORTING SYSTEM
ZY12000/28/63D shield point hydraulic roof support

The 6.3m large mining height is realized. The overall top beam is built with telescopic beams hinged tcconnect the high working resistance of the first and second level protection mechanism. The large minincheiaht roof support is set up as a double passaae, and the middle of the column is set as a protective net toprotect pedestrian safety.